The scheduler can handle multiple resources inside a single instance. Pass the resource list to the resources option with an id, name, color and eventCreation.
id- This is an id that can be referenced in the eventdataname- The name of the resource that will be printed at the top of the respective columncolor- The color controls the default event color of the resource. Event colors can be specific above this. If the color is omitted the underlying events will inherit the default calendar coloreventCreation- This controls if events can be created or dropped onto this resource
The resources in which the resources appear follows the order of the array passed to the component.
Events can be shared between resources and it is possible to move events between resources. The move is handled automatically however you can block it if moving an event from one resource to the other is prohibited. Learn about lifecycle event hooks.